SUCCESS STORY #1
OPEN HOLE LOGGING UNDER MPD CONDITION ON SEMI-SUBMERSIBLE RIG
Challenge
-
Enable safe rig up and allow for accurate depth control during heave compensation
-
Maintain borehole pressure through mud system
-
Control risk of total loss / sudden kick during logging operations
Solution
-
Integrated SMART SUB and grease injection system were used to overcome the RISKS in PMCD conditions
-
Provided simultaneous entry points for wireline tool string and drilling mud
Results
-
Nine successful logging runs conducted under active pressure control
'Wireline Data Acquisition under Managed Pressure and
Pressurized Mud Cap Drilling Condition – Pushing the Boundaries of Data Acquisition Envelope for Formation Evaluation'
We recently submitted a conference paper on the MPD condition which was presented at the Offshore Technology Conference in Asia.
Now available online.
SUCCESS STORY #2
PIPE RECOVERY OPERATION ON SEMI-SUBMERSIBLE RIG USING SMART SUB
Challenge
-
Enable wireline rig up maintaining heave compensation
-
Free stuck BHA by a safe pipe recovery operation
-
Always maintain full well-control
-
Back-off as close as possible to the stuck point
-
Verify free pipe
Solution
-
The SMART SUB was used to allow wireline entry from the side
-
Pad Eye Sub was used to connect the top sheave as part of the BHA and allow for accurate depth measurement during heave compensation
Results
-
Successful and safe pipe recovery at the stuck point, while maintaining full well-control and accurate depth measurement
-
Eliminated the need for complex rig up of coil tubing lifting frame
SUCCESS STORY #3
PIPE RECOVERY OPERATION USING SMART SUB
Challenge
-
Retrieve radioactive sources in horizontal section
-
Free stuck BHA by a safe pipe recovery operation
-
Always maintain full well-control
-
Back-off as close as possible to the stuck point
-
Verify free pipe
Solution
-
Enabled wireline entry while driller had full control on
-
Pumped wireline tool down the horizontal section for radioactive source fishing to release the stuck BHA through the top drive system
-
Pulled / rotated / pumped using the SMART SUB – to enable a safe and simplified pipe recovery operation
Results
-
Successful back-off operation
-
Safe retrieval of radioactive sources
-